Introduction
Toukesan Sankekou Reservoir and Pipeline Facilities
To align with the government's initiatives on agricultural food, agricultural economics, land planning, irrigation techniques, and local revitalization, a pumping station was constructed approximately 1.3 km along the Malipu Lateral Canal of the Baileng Canal. The station is equipped with three 20-horsepower pumps and 594 meters of 4-inch HDPE pipes to pressurize and convey water up a height difference of nearly 60 meters to a newly constructed reservoir with a capacity of 630 tons (15 meters long, 10 meters wide, and 5.8 meters high). The stored water is then distributed through a water distribution valve to various fields for irrigation, thereby expanding the service area and benefiting the residents of Xinshe District.
To align with the government's initiatives on agricultural food, agricultural economics, land planning, irrigation techniques, and local revitalization, a pumping station was constructed approximately 1.3 km along the Malipu Lateral Canal of the Baileng Canal. The station is equipped with three 20-horsepower pumps and 594 meters of 4-inch HDPE pipes to pressurize and convey water up a height difference of nearly 60 meters to a newly constructed reservoir with a capacity of 630 tons (15 meters long, 10 meters wide, and 5.8 meters high). The stored water is then distributed through a water distribution valve to various fields for irrigation, thereby expanding the service area and benefiting the residents of Xinshe District.
Traffic